Description of Project:   Widen/Resurface East Main Street (City of Savannah TDOT Urban Functional Classified Road No. 05729) from Harbert Drive approximately 1,675 LF (0.3 miles) east to new extended East Main Street built for recently constructed Northside Elementary School. Existing road asphalt varies at +/- 18 ft width (two each 9 ft lanes) along the proposed improvement route and connects to the newly constructed road (two each 11 ft lanes w/ 10 ft shoulders) on the project east end. Project scope is to widen/resurface the existing road to accommodate two each 11 ft traffic lanes with approximately 4 ft shoulders.


Length of Project:                      1,675 LF (0.3 miles)

Project Schedule:   Approximate start is week of June 23rd or 30th. Contract duration is for 75 days. Proposal is to complete Phase 1 section from Harbert Drive to Scarlett Drive to be followed immediately by Phase 2 section from Scarlett Drive to project end at new road tie-in. Sections will be closed to through traffic during construction and allow only local traffic access. Detour Map attached:

 

 
< Prev   Next >